SGC Chronicle

11.01.2015

‘SGC constructs metro’

SGC constructors started boring of the left tunnel between Rechnoy vokzal and Khovrino metro stations. A right and left tunnels go parallel. According to constructors, heaving sands and different problem soil types will be overpassed easier and faster at this well-known route.

Back to the list